Find us at Berlin

1 to 3 September 2026.
Stand number E7
who we help

One Platform.
Any Megawatt Use Case

If your fleet needs more power than your grid connection can give it today or in the future, we can help.

Trucks

Depot charging, high-power public charging and en-route corridors. Charge high-power trucks overnight or between shifts without a connection sized for full-fleet simultaneous charging. Start with a
handful of vehicles and scale to a full depot conversion on the same platform.

Buses

Depot charging and en-route charging. Stage depot electrification without disrupting existing operations. Configure dispensers and charging windows around fixed routes and layover schedules.

Charge Point Operators

A dedicated pathway for CPOs deploying across a network of sites they own or operate for others.

Other Applications

Mining, marine and ports, heavy industry and agriculture, waste, and light vehicle fleets. Anywhere charging demand outstrips available grid capacity.

Buses

Stage depot electrification without disrupting existing diesel operations. Dispensers and charging windows configure around fixed routes and layover schedules, and capacity is added as the fleet converts.

Trucks & Logistics

Charge overnight or between shifts without a connection sized for full-fleet simultaneous charging. Support today's CCS trucks and tomorrow's MCS vehicles from the same platform.

Mining

High-power charging in remote and grid-constrained locations where a network upgrade is not practical. Built for demanding environments and continuous duty cycles.

Marine & Ports

Power electric yard equipment and vessel charging within a constrained substation footprint. Modular deployment suits staged terminal electrification.

Heavy Industry

& Agriculture

Electrify heavy equipment and tractor fleets on sites where grid capacity is limited or shared with other industrial loads.

Waste

Electrify collection fleets returning to depot on tight overnight windows, without oversizing the connection for simultaneous peak demand.

Unlock constrained sites

Deploy high-power charging where available grid capacity would otherwise rule the site out.

Scale on one platform

Start with an initial deployment and
grow toward multi-megawatt capacity without redesigning the site.

Structured
commercial models

Partnership models are available for operators deploying across a network.

Foundation
Partner Program

Early partners help shape the platform as it scales, with priority access to new products and input into future configuration and site deployment tools.
SUPPLIERS, PARTNERS & INVESTORS

Wherever You Sit, There is a Way In

GET IN TOUCH
Invest in
What's Next
First Name
Last Name
Email
Company
Any Information You’d Like to Share
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
GET IN TOUCH
Build the Future
of Transport
First Name
Last Name
Email
Company
Any Information You’d Like to Share
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
GET IN TOUCH
Accelerate Your
Fleet Electrification
First Name
Last Name
Email
Company
Any Information You’d Like to Share
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.